Stallion Project
The Stallion target is in the Ponton Tertiary palaeochannel system to the northwest of the Double 8 deposit in granted tenement E28/1523, north of the Nature Reserve. Here, wide spaced reconnaissance drilling on 4km centres by PNC in the early 1980's intersected significant uranium mineralisation in drill holes on each drill traverse over 10km of strike with similar intersections and grades to the Double 8 drilling.

A drill program has been designed, and the approvals and clearances are now being finalised, to commence drilling the Stallion target in late 2009.
