Stallion South Project
Immediately to the south of Stallion along the Ponton palaeochannel, in application E28/1898 in the Nature Reserve, wide spaced reconnaissance drilling on 4km centres by PNC also intersected significant uranium mineralisation, with similar grades to the Double 8 drilling, in drill holes on each drill traverse over a further 6km of strike extending down to the Double 8 deposit.

On regaining exploration access to the area the Stallion South target will be drill tested along with the resource definition drilling at Double 8.
